Datum dimensions
Which dimensions establish mounting distance, shaft location and the relationship to the tooth geometry?
The manufacturing route is planned around the controlled drawing and the acceptance method. The aim is to keep blank datums, heat-treatment condition, tooth finishing and final inspection connected rather than treating them as isolated operations.

Confirm the gear pair, machining references, interfaces and inspection requirements.
Plan turning and interface machining so later gear operations have stable references.
Use the ordered gear system and protect critical surfaces according to the process plan.
Finish teeth where specified, verify drawing characteristics and prepare agreed records.
Not every part needs the same report. A replacement pair may depend on contact, mounting geometry and dimensional comparison with a sample. A drawing-controlled production part may call for a defined gear quality standard, runout, bore or spline checks and material/heat-treatment records. Put these expectations into the RFQ so they can be included in the route and quotation.

Mối quan hệ ghép nối và các mốc lắp ráp càng được xác định rõ ràng thì việc xem xét cấu hình càng nhanh chóng.
Số lượng đặt hàng tối thiểu (MOQ) có thể linh hoạt tùy thuộc vào loại sản phẩm, phương thức sản xuất và tổng giá trị đơn hàng. Các dự án mới phù hợp có thể yêu cầu 1-5 mẫu sản phẩm với giá mẫu. Có thể kết hợp nhiều mẫu sản phẩm khác nhau khi tổng giá trị đơn hàng đạt khoảng 1.500 USD. Các đơn hàng từ 1-2 sản phẩm cũng có thể được xem xét, mặc dù giá thành đơn vị thường cao hơn.
Thời gian lập kế hoạch thông thường là 10-25 ngày làm việc đối với các bộ phận tiêu chuẩn, 20-45 ngày làm việc đối với các linh kiện tùy chỉnh và 45-120 ngày làm việc đối với thiết bị hoặc cụm lắp ráp theo dự án. Các điều khoản EXW, FOB, CIF và DAP thường được hỗ trợ; FCA, CFR, CPT, CIP và DDP có thể được thảo luận cho việc vận chuyển.