Datum dimensions
Which dimensions establish mounting distance, shaft location and the relationship to the tooth geometry?
The manufacturing route is planned around the controlled drawing and the acceptance method. The aim is to keep blank datums, heat-treatment condition, tooth finishing and final inspection connected rather than treating them as isolated operations.

Confirm the gear pair, machining references, interfaces and inspection requirements.
Plan turning and interface machining so later gear operations have stable references.
Use the ordered gear system and protect critical surfaces according to the process plan.
Finish teeth where specified, verify drawing characteristics and prepare agreed records.
Not every part needs the same report. A replacement pair may depend on contact, mounting geometry and dimensional comparison with a sample. A drawing-controlled production part may call for a defined gear quality standard, runout, bore or spline checks and material/heat-treatment records. Put these expectations into the RFQ so they can be included in the route and quotation.

Жұптасу қатынасы мен құрастыру деректері неғұрлым анық анықталса, конфигурацияны соғұрлым тезірек қарауға болады.
MOQ өнім түріне, өндіріс бағытына және тапсырыстың жалпы құнына байланысты икемді. Жаңа жобалар үлгі бағасы бойынша 1-5 үлгі дана сұрауы мүмкін. Тапсырыстың жалпы сомасы шамамен 1500 АҚШ долларына жеткенде аралас модельдерді біріктіруге болады. 1-2 дана тапсырыстарды қайта қарауға болады, бірақ бірлік құны әдетте жоғары болады.
Әдеттегі жоспарлау мерзімдері стандартты бөлшектер үшін 10-25 жұмыс күнін, тапсырыс бойынша жасалған компоненттер үшін 20-45 жұмыс күнін және жобалық типтегі жабдықтар немесе жинақтар үшін 45-120 жұмыс күнін құрайды. EXW, FOB, CIF және DAP әдетте қолдау көрсетіледі; жеткізу үшін FCA, CFR, CPT, CIP және DDP талқылануы мүмкін.