Datum dimensions
Which dimensions establish mounting distance, shaft location and the relationship to the tooth geometry?
The manufacturing route is planned around the controlled drawing and the acceptance method. The aim is to keep blank datums, heat-treatment condition, tooth finishing and final inspection connected rather than treating them as isolated operations.

Confirm the gear pair, machining references, interfaces and inspection requirements.
Plan turning and interface machining so later gear operations have stable references.
Use the ordered gear system and protect critical surfaces according to the process plan.
Finish teeth where specified, verify drawing characteristics and prepare agreed records.
Not every part needs the same report. A replacement pair may depend on contact, mounting geometry and dimensional comparison with a sample. A drawing-controlled production part may call for a defined gear quality standard, runout, bore or spline checks and material/heat-treatment records. Put these expectations into the RFQ so they can be included in the route and quotation.

كلما تم تحديد علاقة التزاوج وبيانات التجميع بشكل أوضح، كلما أمكن مراجعة التكوين بشكل أسرع.
يختلف الحد الأدنى لكمية الطلب حسب نوع المنتج وطريقة التصنيع وقيمة الطلب الإجمالية. يمكن للمشاريع الجديدة المناسبة طلب من قطعة إلى خمس قطع تجريبية بسعر العينات. يمكن دمج نماذج مختلفة عندما يصل إجمالي الطلب إلى حوالي 1500 دولار أمريكي. يمكن مراجعة طلبات من قطعة إلى قطعتين، مع العلم أن تكلفة الوحدة عادةً ما تكون أعلى.
تتراوح فترات التخطيط النموذجية بين 10 و25 يوم عمل للأجزاء القياسية، وبين 20 و45 يوم عمل للمكونات المُخصصة، وبين 45 و120 يوم عمل للمعدات أو التجميعات الخاصة بالمشاريع. وتُدعم شروط التسليم الشائعة EXW وFOB وCIF وDAP؛ بينما يمكن مناقشة شروط FCA وCFR وCPT وCIP وDDP للشحن.