Datum dimensions
Which dimensions establish mounting distance, shaft location and the relationship to the tooth geometry?
The manufacturing route is planned around the controlled drawing and the acceptance method. The aim is to keep blank datums, heat-treatment condition, tooth finishing and final inspection connected rather than treating them as isolated operations.

Confirm the gear pair, machining references, interfaces and inspection requirements.
Plan turning and interface machining so later gear operations have stable references.
Use the ordered gear system and protect critical surfaces according to the process plan.
Finish teeth where specified, verify drawing characteristics and prepare agreed records.
Not every part needs the same report. A replacement pair may depend on contact, mounting geometry and dimensional comparison with a sample. A drawing-controlled production part may call for a defined gear quality standard, runout, bore or spline checks and material/heat-treatment records. Put these expectations into the RFQ so they can be included in the route and quotation.

接合関係と組立基準が明確に定義されていればいるほど、構成の確認は迅速に行える。
最小発注数量(MOQ)は、製品の種類、製造方法、および注文総額によって柔軟に対応可能です。適切な新規プロジェクトでは、サンプル価格で1~5個のサンプルを注文できます。注文総額が約1,500米ドルに達した場合、複数のモデルを組み合わせることができます。1~2個の注文も検討可能ですが、通常は単価が高くなります。
標準部品の一般的な納期は10~25営業日、特注部品は20~45営業日、プロジェクト型機器または組立品は45~120営業日です。EXW、FOB、CIF、DAPは一般的に対応可能ですが、FCA、CFR、CPT、CIP、DDPについてはご相談ください。