
ماشین آلات CNC
درایوهای زاویه قائمه و مکانیزمهای موقعیتیابی که در آنها سفتی نصب و لقی اهمیت دارد.
راهنمای درخواست →For projects destined for Germany, prepare a clean metric drawing set, revision status, material and heat-treatment requirements, tooth finish and the inspection records expected with the order.

CNC machine tools, automation and industrial drivetrains often benefit from a quotation package that clearly separates prototype approval from repeat production.
If the drawing was converted from another unit system, keep the original controlled values available and identify the conversion. For replacement work, add the mating component and housing measurements rather than relying on one worn gear.

| Information group | Recommended content |
|---|---|
| Drawing control | Current revision, original units, mating member reference and any approved change notes |
| جفت دنده | Ratio/tooth counts, hand, shaft angle, mounting distance/backlash and pair identity |
| Interfaces | Bore, keyway, spline, shaft, bearing and housing datums that locate the component |
| وظیفه | Speed, torque/load spectrum, reversals, shock, operating environment and lubrication |
| کیفیت | Required tooth finish, applicable acceptance criteria and inspection records |
| تجاری | Prototype/repeat quantities, sample need, destination and preferred Incoterm |
For a German OEM or MRO drawing, keep controlled dimensions in the original unit system and show conversions only as a communication aid. When an old part number or sample is used for identification, add current measurements and mating-pair data so the quotation is not dependent on a legacy reference alone.
For custom work, the accepted drawing revision remains the clearest way to control the ordered configuration.


درایوهای زاویه قائمه و مکانیزمهای موقعیتیابی که در آنها سفتی نصب و لقی اهمیت دارد.
راهنمای درخواست →
مکانیزمهای فشرده با محورهای متقاطع با قابلیت معکوس شدن عملکرد و الزامات تکرارپذیری.
راهنمای درخواست →
انتقال تغییر جهت در اطراف دروازهها و تجهیزات موقعیتیابی خودکار.
راهنمای درخواست →
مکانیزمهای سنگین که در آنها کمکفنر، استارت/استاپ و چیدمان تکیهگاهها نیاز به بررسی دارند.
راهنمای درخواست →

مراحل گیربکس که گشتاور را از طریق چیدمانهای متقاطع شفت هدایت میکنند.
راهنمای درخواست →
Replacement spiral bevel gear work begins by separating original design information from service wear. A damaged tooth, distorted bore or shifted contact pattern can describe the failure, but…
مشاهده پیکربندی →
A heavy-duty spiral bevel gear pair should be reviewed from the complete operating duty. Peak load, continuous load, shock events, reversals, bearing support and lubrication can all matter…
مشاهده پیکربندی →
Integrating the spiral bevel pinion with a shaft reduces separate joints, but it makes bearing journals, shoulders, splines, threads and tooth datums part of one manufacturing problem. The…
مشاهده پیکربندی →
A spiral miter gear set uses equal tooth counts to transmit motion between intersecting shafts without intentionally changing speed ratio. Equal ratio simplifies one part of the selection,…
مشاهده پیکربندی →
Ground spiral bevel gears require more than adding a grinding operation to a normal gear. The datum scheme, pre-grind geometry, heat treatment, grinding allowance and final inspection have…
مشاهده پیکربندی →
A custom spiral bevel gear set is built around project-specific geometry rather than a public stock table. The useful definition includes both members of the pair, the axis…
مشاهده پیکربندی →برای برنامهریزی درخواست قیمت، حداقل مقدار سفارش (MOQ) انعطافپذیر است و به شکل محصول، مسیر پردازش و ارزش کلی سفارش بستگی دارد. پروژههای جدید مناسب ممکن است برای ۱ تا ۵ قطعه نمونه با قیمت نمونه بررسی شوند. وقتی کل سفارش به حدود ۱۵۰۰ دلار آمریکا رسید، میتوان مدلهای مختلف را با هم ترکیب کرد. سفارشهای ۱ تا ۲ قطعه نیز میتوانند در نظر گرفته شوند، که معمولاً با هزینه واحد بالاتر همراه هستند زیرا راهاندازی و بازرسی در تعداد بسیار کمی انجام میشود.
برای درخواست برنامهریزی تحویل پیشفاکتور، بازههای زمانی معمول برای قطعات استاندارد ۱۰ تا ۲۵ روز کاری، برای اجزای سفارشی ۲۰ تا ۴۵ روز کاری و برای تجهیزات یا مجموعههای پروژهای ۴۵ تا ۱۲۰ روز کاری است. EXW، FOB، CIF و DAP معمولاً پشتیبانی میشوند؛ FCA، CFR، CPT، CIP و DDP را میتوان برای محموله و مقصد خاص مورد بحث قرار داد.
هرچه رابطه جفتسازی و مبنای مونتاژ واضحتر تعریف شوند، پیکربندی سریعتر قابل بررسی خواهد بود.
حداقل مقدار سفارش (MOQ) بسته به نوع محصول، مسیر تولید و ارزش کل سفارش انعطافپذیر است. پروژههای جدید مناسب ممکن است ۱ تا ۵ قطعه نمونه را با قیمت نمونه درخواست کنند. مدلهای ترکیبی را میتوان زمانی که کل سفارش تقریباً به ۱۵۰۰ دلار آمریکا برسد، ترکیب کرد. سفارشهای ۱ تا ۲ قطعهای قابل بررسی هستند، اگرچه هزینه واحد معمولاً بالاتر است.
بازههای برنامهریزی معمول برای قطعات استاندارد ۱۰ تا ۲۵ روز کاری، برای اجزای سفارشی ۲۰ تا ۴۵ روز کاری و برای تجهیزات یا مجموعههای پروژهای ۴۵ تا ۱۲۰ روز کاری است. EXW، FOB، CIF و DAP معمولاً پشتیبانی میشوند؛ FCA، CFR، CPT، CIP و DDP را میتوان برای حمل و نقل مورد بحث قرار داد.