도면 제어
Use one current drawing revision for tooth geometry, interfaces, material requirements and acceptance notes.
EVER POWER works with industrial buyers that need spiral bevel gears reviewed as part of an assembly. The focus is practical: define the mating pair, keep drawing revisions controlled, connect the tooth geometry to the mounting datums, and agree how the finished parts will be inspected.

The product range on spiralgears.top covers custom matched sets, ground tooth configurations, miter arrangements, pinion shafts, heavy-duty pairs and replacement work. Exact geometry is project-specific. We do not present an unsupported stock size as a substitute for the drawing or imply that an unknown existing mate is automatically compatible.
This makes the first technical conversation more useful. Buyers can send the information they have, mark what is unknown, and build the quotation around the real assembly rather than a generic product label.

A typical project moves from drawing or sample review into manufacturability, blank and datum planning, gear cutting, heat treatment where specified, tooth finishing, interface finishing and final inspection. The exact route depends on the ordered configuration; the important point is that changes in one stage do not silently break the references needed later.
For replacement work, the early identification step is especially important because wear can hide the original geometry. Mating parts, legacy drawings and assembly measurements help separate design intent from service damage.

For projects where a ground tooth finish and coordinated heat-treatment/grinding route are required.
Integrated shaft and pinion components where journals, shoulders and tooth datums are reviewed together.
Identification-led work for worn, obsolete or undocumented pairs and existing housings.
Quantities, sample needs, target timing, destination and trade terms affect the manufacturing and logistics plan. Send them with the technical data rather than after the geometry has already been quoted. This makes it easier to distinguish a prototype, a maintenance replacement and a repeat-production project.
Questions can be sent directly to [email protected]. Drawings and sample context can be attached through the RFQ form.

견적 요청 시 최소 주문 수량(MOQ)은 제품 형태, 가공 방식 및 총 주문 금액에 따라 유동적입니다. 적합한 신규 프로젝트의 경우 샘플 가격으로 1~5개의 샘플 제품에 대한 검토가 가능합니다. 총 주문 금액이 약 1,500달러에 도달하면 여러 모델을 조합하여 주문할 수 있습니다. 1~2개 소량 주문도 가능하지만, 소량 주문에 대한 설정 및 검사 비용이 분산되므로 단가가 더 높을 수 있습니다.
견적 요청 시 납기 계획은 일반적으로 표준 부품의 경우 10~25영업일, 맞춤형 부품의 경우 20~45영업일, 프로젝트형 장비 또는 조립품의 경우 45~120영업일이 소요됩니다. EXW, FOB, CIF, DAP 조건이 일반적으로 적용되며, FCA, CFR, CPT, CIP, DDP 조건은 특정 선적 및 목적지에 따라 협의 가능합니다.
결합 관계 및 조립 기준점이 명확하게 정의될수록 구성 검토 속도가 빨라집니다.
최소 주문 수량(MOQ)은 제품 유형, 제조 방식 및 총 주문 금액에 따라 유동적입니다. 적합한 신규 프로젝트의 경우 샘플 가격으로 1~5개의 샘플을 요청할 수 있습니다. 총 주문 금액이 약 1,500달러에 도달하면 여러 모델을 조합하여 주문할 수 있습니다. 1~2개 주문도 검토 가능하지만, 일반적으로 단가가 더 높습니다.
일반적인 계획 기간은 표준 부품의 경우 10~25영업일, 맞춤형 부품의 경우 20~45영업일, 프로젝트형 장비 또는 조립품의 경우 45~120영업일입니다. EXW, FOB, CIF 및 DAP 조건이 일반적으로 지원되며, FCA, CFR, CPT, CIP 및 DDP 조건은 선적 조건에 대해 협의 가능합니다.